An audit that answers one question: should I place this order?
A day on site with an engineer who has spent years in factories like yours. You get the production floor, the paperwork behind it, and a plain verdict — not a 90-page template with every box ticked.
Price
$398
per man-day, all-inclusive
Typical length
1–2 days
Small plant 1, 300+ workers 2
Report
3 days
After the audit, in English
What we're actually looking for
An audit is not a photograph album. It is a series of questions asked in a fixed order, with the answers checked against each other: the machine list against the production floor, the licence against the address, the capacity the sales team claims against what the line can do in a week.
Where the answer cannot be established, the report says so. A gap that is clearly labelled is useful; a gap that has been filled in for you is not.
Assessed on site
- Legal entity, licence and the address you are actually visiting
- Production processes, machines and how they are maintained
- Capacity evidence: output records, shift pattern, current order book
- Quality control: incoming, in-process, final, and who signs off
- Workforce size, skill level, and whether lines are in-house
- Evidence they have made your product before — and for whom
- Site safety, storage, and obvious compliance risks
The day
A structure, not a stroll.
Timings shift with the size of the plant, but the order does not. Opening meeting first, floor second, records third — so documents are checked against what was seen, not the other way round.
-
Opening meeting
Who is in the room, who owns which process, and what the factory expects us to see.
-
Site and workshop walk
Every production step, including the ones they would rather skip.
-
Capability and capacity
Machines, tooling, maintenance logs, output records and the current order book.
-
Quality system
Incoming inspection, in-process checks, final inspection, defect handling and rework.
-
Records and documents
Licence, certifications, export records, workforce and training files.
-
Closing debrief
Findings stated to the factory on the spot, and any corrective actions agreed in writing.
What you receive
One report you can act on.
A one-page verdict
Proceed, proceed with conditions, or find another supplier — with the two or three findings that drove the call.
Scored sections
Capability, quality, capacity and risk scored separately, so you can see which one is weak rather than one meaningless total.
Dated photographs
The floor, the line, the warehouse, the QC area and any defect or safety issue, timestamped and captioned.
The paperwork trail
Licence, certifications and export records as seen on site, attached as originals with translations of the key fields.
Corrective actions
What the factory must fix before production, phrased so a factory manager can act on it.
A call, if you want one
Twenty minutes with the auditor to go through what was seen and what it means for your order.
Choosing the right check
Three services get confused. They answer different questions.
If you are not sure which one you need, the answer is usually the cheapest one that resolves your uncertainty. We will tell you when a $129 check is enough and an audit would be money spent proving something you already know.
| Service | Answers | Where | From |
|---|---|---|---|
| Verification | Is this a real company, and is it plausible for my product? | Public records, desk | $129 |
| Factory audit | Can this plant actually make my order, well and on time? | On site, a full day | $398 |
| Inspection | Are the goods already made to my specification? | On site, at packing | $399 |
Prices are per man-day or per report as shown. Travel outside Guangdong is quoted at cost before booking.
Questions buyers ask
Before you book an audit.
Do I need to tell the factory I'm ordering an audit?
Usually yes — an announced audit gets cooperation, documents and access. Unannounced audits are possible for existing suppliers, but the factory may refuse entry, and that outcome tells you something too.
How far in advance should I book?
Three working days is usually enough for Guangdong. We confirm the auditor and the date in writing before you pay.
Can the auditor also inspect goods in the same trip?
If goods are ready, yes — and it is cheaper, because travel is shared. Tell us at booking so the day is planned for both.
What if the factory refuses part of the audit?
We record the refusal, what was being asked for, and where in the plant it happened. A refusal to show a licence or a production line is a finding in its own right.
Tell us the factory and the product.
We'll confirm the man-days needed and the date, usually within a working day.