Check the goods. Before the balance leaves your account.
An inspection is the cheapest insurance in the whole order. For $399 an inspector stands in front of your cartons, counts them, opens a statistically valid sample, and tells you whether to pay.
On-site inspection
$399
per man-day
Sample check
From $189
samples sent to our office
Loading supervision
$238
per container
What an inspection actually checks
Every inspection is written against your specification — not against a generic checklist. If your order has a colour standard, a tolerance table, a logo position or a carton marking requirement, that is what gets measured.
The inspector works from a tablet, records each defect category as it is found, and photographs the evidence as it comes up. There is no version of the visit where the findings are reconstructed afterwards.
Checked on every inspection
- Carton count against the packing list and PO quantity
- Visual defects: appearance, finish, colour, print and assembly
- Dimensions and tolerances against your drawing or sample
- Function and safety tests where the product allows it
- Labels, manuals, barcodes, retail packaging and carton marks
- Carton drop and stacking condition, inner packing integrity
Sampling
How many cartons does an inspector open?
We sample to ISO 2859-1, general inspection level II, at the AQL you agree — 2.5 for major defects is the common default. On a 3,000-piece order that means 125 pieces pulled across the cartons, not three pieces pulled from the top.
| Order quantity | Pieces inspected | Accept at 2.5 | Reject at 2.5 |
|---|---|---|---|
| 151 – 280 | 32 | 2 | 3 |
| 281 – 500 | 50 | 3 | 4 |
| 501 – 1,200 | 80 | 5 | 6 |
| 1,201 – 3,200 | 125 | 7 | 8 |
| 3,201 – 10,000 | 200 | 10 | 11 |
| 10,001 – 35,000 | 315 | 14 | 15 |
Simplified extract for AQL 2.5, single sampling, normal inspection. Critical defects are always zero-tolerance. We confirm the plan with you before the visit so the inspector and the factory are working to the same numbers.
Getting the inspection right
Most failed inspections fail for boring reasons: the goods aren't packed, the spec was never sent, or nobody told the factory anyone was coming.
Before the visit
Send us the specification, the approved sample photos, the packing list and the PO. We prepare the check sheet from those — that is what makes the report specific to your order instead of generic.
- Goods at least 80% packed, ideally 100%
- The factory told in advance, with our name and time
- A signed golden sample at the factory to compare against
Sample check at our office
For small orders, samples or pre-production checks, couriering goods to us is often cheaper than a site visit. We inspect against your golden sample and report within two working days of arrival.
- Useful for confirming a sample before a full production run
- Not a substitute for on-site inspection on large orders
From $189
Ask about sample checksCourier costs are yours. We will tell you what to send and how to label it.
Container loading supervision
Goods can pass inspection and still leave the factory wrong. We watch the container being loaded, count what goes in, check the condition of the container itself, and seal it with a numbered seal that appears in the report.
- Cartons counted in, matched to the packing list
- Container inspection: holes, moisture, previous cargo residue
- Seal number photographed and recorded
$238 per container
Book loading supervisionBooked alongside a pre-shipment inspection at the same factory, travel is shared and the combined cost is lower. Ask us for the figure.
When it fails
A failed inspection is not the end of the order.
It is the moment you have leverage. Most defects are fixable in a rework window, and a dated report is what makes the factory do the rework instead of arguing. We stay on it: rework supervision and a re-inspection are usually cheaper than a second full inspection.
Hold the balance
The report goes out within 24 hours, while the payment is still in your hands.
Agree the rework
We put the fix list to the factory in Chinese and get a written commitment with a date.
Re-inspect the fix
A shorter return visit checks only the defects found, not the whole order again.
Questions buyers ask
About inspection day.
Can I attend the inspection myself?
Yes, and it is often worth it. Tell us in advance so the inspector plans for it. If you cannot travel, we can run a video walkthrough during the visit instead.
What if the goods aren't ready when the inspector arrives?
If less than 80% is packed, the inspection usually cannot produce a valid result. We report what we found, and the visit is charged as an attendance. That is why we ask you to confirm readiness with the factory the day before.
Do you inspect against European or US standards?
We inspect against the specification you agree with the factory. For regulated categories we can check labelling and documentation against the standard you name — CE, UKCA, FCC, CPSIA — but we are not a notified body and do not issue certification.
When will your goods be packed?
Give us the date and the factory address. We'll confirm an inspector and send you the check sheet to approve.